We believe strongly that we can and must do something different.
Our aim is to make your ideas come true.
Part 1: 300-500kg/hr Malt Milling Unit | ||
300-500kg/hr Malt Miller | 1set | |
Flexible Auger | 1set | |
Part 2: 2000L Two Vessel/HLT Brewhouse | ||
20HL Mash/Lauter Tun | 1set | |
20HL Kettle/Whirlpool Tun | 1set | |
40HL Hot Water Tank | 1set | |
Part 3: Fermentation Unit | ||
4000L Fermentation Tank/Unitank | 4sets | |
2000L Fermentation Tank/Unitank | 4sets | |
4000L Bright Beer Tank | 1set | |
2000L Bright Beer Tank | 1set | |
Part 4: Glycol Cooling Unit | ||
4000L Glycol Water Tank | 1set | |
8HP Glycol Water Chiller | 2sets | |
Glycol Water Pipeline | 1unit | |
Part 5: Electric Control Unit | ||
Brewhouse Control Cabinet | 1set | |
Fermentation Control Cabinet | 1set | |
Part 6: 200L Portable CIP Cart [Two Tanks] | ||
200L Single Wall Caustic Tank | 1set | |
200L Single Wall Acid Tank | 1set | |
Sanitary Centrifugal Pump | 1set | |
Part 8: Keg Filling Unit | ||
1-Station Keg Filler | 1set | |
2-Station 2-Tank Auto Keg Rinser | 1set | |
Part 9: Bottle Filling Unit | ||
8-Station Semiauto Bottling Machine | 1set | |
Part 10: Other Auxiliary Equipment | ||
Steam boiler and supply | 1set | |
Compressed Air Supply | 1set |
CN Jinan- 2668
Jichang Rd.
24/7 Support
+86 531 88161066
Request A Quote